HomeMy WebLinkAbout20250069 Ver 1_ePCN Application_20250115i DWR Division of Water Resources Pre -Construction Notification (PCN) Form For Nationwide Permits and Regional General Permits (along with corresponding Water Quality Certifications) October 2, 2023 Ver 4.3 Initial Review Has this project met the requirements for acceptance in to the review process? Yes No Is this project a public transportation project?* Yes No Change only If needed. Does this project involve maintenance dredging funded by the Shallow Draft Navigation Channel Dredging and Aquatic Weed Fund, electric generation projects located at an existing or former electric generating facility, or involve the distribution or transmission of energy or fuel, including natural gas, diesel, petroleum, or electricity? Yes No BIMS # Assigned Version# * 20250069 1 Is a payment required for this project?* No payment required Fee received Fee needed - send electronic notification Reviewing Office* Winston-Salem Regional Office - (336) 776- 9800 Information for Initial Review la. Name of project: EGNC T-015 Reliability Project la. Who is the Primary Contact?* Joey Lawler 1b. Primary Contact Email: jlawler@smeinc.com Date Submitted 1/15/2025 Nearest Body of Water Multiple crossings of named tributaries - See attached cover letter Basin Roanoke Water Classification Multiple crossings of named tributaries - See attached cover letter Site Coordinates Latitude: Longitude: 36.495683-79.679959 A. Processing Information What amount is owed?* $240.00 $323.00 Select Project Reviewer* Rebecca Chandler:rebecca.chandler 1c. Primary Contact Phone:* (704)604-6474 Is this application for a project associated with emergency response/repairs from Hurricane Helene impacts to your project or property? Yes No Is this project connected with ARPA funding? Yes No County (or Counties) where the project is located: Caswell Person $570.00 $767.00 u Rockingham Is this a NCDMS Project Yes No Is this project a public transportation project?* Yes No 1a.Type(s)of approval sought from the Corps: Section 404 Permit (wetlands, streams and waters, Clean Water Act) Section 10 Permit (navigable waters, tidal waters, Rivers and Harbors Act) Has this PCN previously been submitted?* Yes No 1b. What type(s) of permit(s) do you wish to seek authorization? Nationwide Permit (NWP) Regional General Permit (RGP) Standard (IP) 1c. Has the NWP or GP number been verified by the Corps? Yes No Nationwide Permit (NWP) Number: 12 - Utility Lines NWP Numbers (for multiple NWPS): 1d. Type(s) of approval sought from the DWR: 401 Water Quality Certification - Regular Non-404 Jurisdictional General Permit Individual 401 Water Quality Certification le. Is this notification solely for the record because written approval is not required? For the record only for DWR 401 Certification: For the record only for Corps Permit: 1f. Is this an after -the -fact permit application? * Yes No 1g. Is payment into a mitigation bank or in -lieu fee program proposed for mitigation of impacts? Yes No 1g. Is payment into a mitigation bank or in -lieu fee program proposed for mitigation of impacts? Yes No 1h. Is the project located in any of NC's twenty coastal counties? Yes No 9j. Is the project located in a designated trout watershed? Yes No B. Applicant Information 1d. Who is applying for the permit? Owner Applicant (other than owner) le. Is there an Agent/Consultant for this project? Yes No 2. Owner Information 2a. Name(s) on recorded deed: Enbridge Gas North Carolina (easement holder) 2b. Deed book and page no.: N/A 2c. Contact Person: Ernie Ladkani 401 Water Quality Certification - Express Riparian Buffer Authorization Yes No Yes No 2d. Address Street Address 915 N Eldridge Parkway Address Line 2 Suite 1100, 9105-D city Houston Postal / Zip Code 77079 2e. Telephone Number: (346)498-4637 2g. Email Address:* ern ie.ladkani@enbridge.com 3. Applicant Information (if different from owner) 3a. Name: Ernie Ladkani 3b. Business Name: Enbridge Gas North Carolina 3c.Address Street Address 915 N Eldridge Parkway Address Line 2 Suite 1100, 9105-D city Houston Postal / Zip Code 77079 3d. Telephone Number: (346)498-4637 3f. Email Address:* ernie.ladkani@enbridge.com 4. Agent/Consultant (if applicable) 4a. Name: Joey Lawler, PWS 4b. Business Name: S&ME, Inc. 4c.Address Street Address 2016 Ayrsley Town Blvd Address Line 2 Suite 2A city Charlotte Postal / Zip Code 28273 4d. Telephone Number: (704)604-6474 M. Email Address:* jlawler@smeinc.com C. Project Information and Prior Project History 1. Project Information 1b. Subdivision name: (if appropriate) N/A 1c. Nearest municipality / town: Yanceyville State / Province / Region TX Country USA 2f. Fax Number: State / Province / Region TX Country USA 3e. Fax Number: State / Province / Region NC Country USA 4e. Fax Number: O 2. Project Identification 2a. Property Identification Number: See attached information 2c. Project Address Street Address East of INC Hwy 700 near Eden, NC to north of INC Hwy 57 near Semora, NC Address Line 2 city Eden to Semora Postal / Zip Code 27288 3. Surface Waters 3a. Name of the nearest body of water to proposed project: * Multiple crossings of named tributaries - See attached cover letter 3b. Water Resources Classification of nearest receiving water:" Multiple crossings of named tributaries - See attached cover letter 3c. What river basin(s) is your project located in?" Roanoke 2b. Property size: 823 in LOD 3d. Please provide the 12-digit HUC in which the project is located. 030101040106,030101040504,030101040105,030101040107,030101040501,030101040506, 030101040505,030101040108,030101040502,030101040203,030101040507,030101030905, and 030101030901 4. Project Description and History State / Province / Region NC Country USA 4a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application: " See attached cover letter 4b. Have Corps permits or DWR certifications been obtained for this project (including all prior phases) in the past?" Yes No Unknown 4f. List the total estimated acreage of all existing wetlands on the property: 21.92 acres in Review Area 4g. List the total estimated linear feet of all existing streams on the property: 38,870 LF in Review Area 4h. Explain the purpose of the proposed project: See attached cover letter 41. Describe the overall project in detail, including indirect impacts and the type of equipment to be used: See attached cover letter 5. Jurisdictional Determinations 5a. Have the wetlands or streams been delineated on the property or proposed impact areas?* Yes No Comments: 5b. If the Corps made a jurisdictional determination, what type of determination was made? Preliminary Approved Not Verified Unknown N/A Corps AID Number: SAW-2024-01999 5c. If 5a is yes, who delineated the jurisdictional areas? Name (if known): Joey Lawler, PWS, Walter Cole, LSS, Ron Walker and other qualified S&ME staff Agency/Consultant Company: S&ME, Inc. Other: 6. Future Project Plans 6a. Is this a phased project?" Yes OO No Unknown Are any other NWP(s), regional general permit(s), or individual permits(s) used, or intended to be used, to authorize any part of the proposed project or related activity? N/A D. Proposed Impacts Inventory 1. Impacts Summary 1a. Where are the impacts associated with your project? (check all that apply): Wetlands Streams -tributaries Buffers Open Waters Pond Construction 2. Wetland Impacts W1-W164 2a1 Reason (?) Pipeline construction 2b. Impact type* (?) T fTy pe of W. * Unknown 2d. W. name See table 2e. Forested Yes 2f. Type of Jurisdicition * ?) Both �2g. Impact area 13.603 (acres) W1-W164 Permanentconversion P Unknown See table Yes Both 1.390 (acres) 2g. Total Temporary Wetland Impact 2g. Total Permanent Wetland Impact 13.603 1.390 2g. Total Wetland Impact 14.993 21. Comments: See attached Wetland and Open Water Impact Tables for each individual wetland impact, NCWAM and vegetation cover type, etc. 3. Stream Impacts F S1 3a. Reason for impact (?) Pipeline construction 3b.lmpact type* Temporary 3c. Type of impact* Other 3d. S. name* See table 3e. Stream Type* ?) Perennial 3f. Type of Jurisdiction* Both 3g. S. width Average (feet) 3h. Impact length* 18,095 (linear feet) g2 Low-water crossings Permanent Other See table Perennial Both Average (feet) 680 (linear feet) 3i. Total jurisdictional ditch impact in square feet: 0 3i. Total permanent stream impacts: 31. Total temporary stream impacts: 680 18,095 3i. Total stream and ditch impacts: 698 3j. Comments: See attached Stream Impact Table for each individual stream impact, type, width etc. Note that Box 3i should calculate as 18,775 LF. 4. Open Water Impacts 4a. Site # 4a1. Impact Reason 4b. Impact type 4c. Name of waterbody 4d. Activity type �114e. Waterbody type 4f. Impact area OW1-OW3 Pipeline Construction T See table Other _11 Pond 0.39 4g. Total temporary open water Impacts: 0.39 4g. Total open water impacts: 0.39 4h. Comments: See attached Wetland and Open Water Impact Tables for each individual open water impact. E. Impact Justification and Mitigation 1. Avoidance and Minimization 4g. Total permanent open water impacts: 0.00 I 1a. Specifically describe measures taken to avoid or minimize the proposed impacts in designing the project: See attached cover letter 1b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques: See attached cover letter 2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State 2a. Does the project require Compensatory Mitigation for impacts to Waters of the U.S. or Waters of the State? Yes No 2c. If yes, mitigation is required by (check all that apply): DWR Corps 2d. If yes, which mitigation option(s) will be used for this project? Mitigation bank Payment to in -lieu fee program Permittee Responsible Mitigation 4. Complete if Making a Payment to In -lieu Fee Program 4a. Approval letter from in -lieu fee program is attached. Yes No 4b. Stream mitigation requested: (linear feet) 0 4d. Buffer mitigation requested (DWR only): (square feet) 0 4f. Non -riparian wetland mitigation requested: (acres) 0 4c. If using stream mitigation, what is the stream temperature: 4e. Riparian wetland mitigation requested: (acres) 1.39 acre 4g. Coastal (tidal) wetland mitigation requested: (acres) 0 4h. Comments A request for a credit availability letter has ben submitted to NCDMS, and will be provided to the USACE.. EGNC understands that purchase of the appropriate mitigation credit is required prior to initiation of the project. F. Stormwater Management and Diffuse Flow Plan (required by DWR) 1. Diffuse Flow Plan 1a. Does the project include or is it adjacent to protected riparian buffers identified within one of the NC Riparian Buffer Protection Rules? Yes No If no, explain why: Project is not located in a watershed subject to state -administered riparian buffers. 2. Stormwater Management Plan 2a. Is this a NCDOT project subject to compliance with NCDOT's Individual NPDES permit NCS000250? Yes No 2b. Does this project meet the requirements for low density projects as defined in 15A NCAC 02H .1003(2)? Yes No Comments: Project is a belowground, linear pipeline project. Stormwater management associated with the proposed station sites and aboveground elements will be permitted by the appropriate local or NCDEQ authority as necessary. G. Supplementary Information 1. Environmental Documentation 1a. Does the project involve an expenditure of public (federal/state/local) funds or the use of public (federal/state) land? Yes No 1b. If you answered "yes" to the above, does the project require preparation of an environmental document pursuant to the requirements of the National or State (North Carolina) Environmental Policy Act (NEPA/SEPA)?* Yes No Comments: * See attached cover letter 0 6 2. Violations (DWR Requirement) 2a. Is the site in violation of DWR Water Quality Certification Rules (15A NCAC 2H .0500), Isolated Wetland Rules (15A NCAC 2H .1300), or DWR Surface Water or Wetland Standards or Riparian Buffer Rules (15A NCAC 2B .0200)? * Yes No 3. Cumulative Impacts (DWR Requirement) 3a. Will this project result in additional development, which could impact nearby downstream water quality? Yes No 3b. If you answered "no," provide a short narrative description. See attached cover letter 4. Sewage Disposal (DWR Requirement) 4a. Is sewage disposal required by DWR for this project? Yes No N/A 5. Endangered Species and Designated Critical Habitat (Corps Requirement) 5a. Will this project occur in or near an area with federally protected species or habitat? Yes No 5b. Have you checked with the USFWS concerning Endangered Species Act impacts? Yes No 5c. If yes, indicate the USFWS Field Office you have contacted. Raleigh 5d. Is another Federal agency involved?* Yes No 5e. Is this a DOT project located within Division's 1-8? Yes No 5f. Will you cut any trees in order to conduct the work in waters of the U.S.? Yes No 5g. Does this project involve bridge maintenance or removal? Yes No 5h. Does this project involve the construction/installation of a wind turbine(s)?' Yes No Unknown 5i. Does this project involve (1) blasting, and/or (2) other percussive activities that will be conducted by machines, such as jackhammers, mechanized pile drivers, etc.? Yes No 5j. What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat? See attached cover letter and supporting information 6. Essential Fish Habitat (Corps Requirement) 6a. Will this project occur in or near an area designated as an Essential Fish Habitat? Yes No 6b. What data sources did you use to determine whether your site would impact an Essential Fish Habitat? NOAA Essential Fish Habitat Mapper - hftps://www.fisheries.noaa.gov/resource/map/essential-fish-habitat-mapper 7. Historic or Prehistoric Cultural Resources (Corps Requirement) 7a. Will this project occur in or near an area that the state, federal or tribal governments have designated as having historic or cultural preservation status? Yes No 7b. What data sources did you use to determine whether your site would impact historic or archeological resources? See attached cover letter 8. Flood Zone Designation (Corps Requirement) 8a. Will this project occur in a FEMA-designated 100-year floodplain? Yes No 8b. If yes, explain how project meets FEMA requirements: Portions of the project that cross FEMA-designated floodplains will be approved by the appropriate county/municipal floodplain management departments. 8c. What source(s) did you use to make the floodplain determination? NC Flood Mapper - hftps://flood.ne.gov/ncflood/riskToolsFull.htmi Miscellaneous 0 u Please use the space below to attach all required documentation or any additional information you feel is helpful for application review. Documents should be combined into one file when possible, with a Cover Letter, Table of Contents, and a Cover Sheet for each Section preferred. Click the upload button or drag and drop files here to attach document EGNC T-15 Reliability Project Cover Letter and Supporting Information.pdf 223.23MB File must be PDF or KMZ Comments Please see attached cover letter and supporting information contained in the associated appendices. Signature By checking the box and signing below, I certify that: • The project proponent hereby certifies that all information contained herein is true, accurate, and complete to the best of my knowledge and belief'; and • The project proponent hereby requests that the certifying authority review and take action on this CWA 401 certification request within the applicable reasonable period of time. • I have given true, accurate, and complete information on this form; • I agree that submission of this PCN form is a "transaction' subject to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act"); • I agree to conduct this transaction by electronic means pursuant to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act"); • I understand that an electronic signature has the same legal effect and can be enforced in the same way as a written signature; AND • I intend to electronically sign and submit the PCN form. Full Name: Joey Lawler Signature -W LAWLIr�- Date 1/15/2025