Drainage improvements to guard against future erosion along the slope. Shoulder widened, and guardrail replacement.
- Scheduled for construction in 2025
Safety improvements with reconstruction of some portions of the intersection in Rochester
- Scheduled for construction in 2027
In 2026, the Hwy 14 corridor in Rochester from Hwy 52 to Crossroads Dr. SW and from 3rd Ave. SE to Marion Rd. SE/15th Ave. SE will be resurfaced.
- Scheduled for construction in 2025
Construction of a roundabout to improve intersection safety and traffic mobility at Hwy 19 and Rice Co. Rd. 2 north of Lonsdale.
- Scheduled for construction in 2025
Construction of a roundabout to improve intersection safety and traffic mobility at Hwy 19 and Rice Co. Rd. 2 north of Lonsdale.
Resurface Hwy 30 from Hwy 63 to 5th Ave. NE.
- Scheduled for construction in 2028
Study of Interstate 35/Interstate 90 interchange corridor near Albert Lea to guide improvements.
Resurface Hwy 43 from Mankato Ave to the Mississippi River Bridge. Reconstruct sidewalks, Improve mobility and safety for all.
- Scheduled for construction in 2028
Construction of a roundabout at Hwy 44 and Hwy 76 in Caledonia
- Scheduled for construction in 2028
In 2027, MnDOT will resurface Hwy 52 and replace box culverts.
- Scheduled for construction in 2027
MnDOT and Goodhue County are analyzing and evaluating the Hwy 52 corridor between Zumbrota and Hader.
Pavement improvements
- Scheduled for construction in 2028
Repave a section of Hwy 57 and build a roundabout
- Scheduled for construction in 2027
Construct a roundabout at Hwy 63 and Hwy 247 in Olmsted County.
- Scheduled for construction in 2027
Reconstruct portions of Hwy 16/Hwy 63 and make improvements for pedestrians to meet current Americans with Disabilities Act.
- Scheduled for construction in 2029
Build a roundabout north of Rochester
- Scheduled for construction in 2025
Replace the Hwy 74 bridge over the South Fork Whitewater River
- Scheduled for construction in 2025
Repaving I-90 and replacing westbound bridge. Nodine to Dakota in Winona County.
- Scheduled for construction in 2026
Replacing and repairing six bridges.
- Scheduled for construction in 2024-2026
We plan to resurface I-90 from Austin to Dexter. The work includes resurfacing and improving exit and entrance ramps.
- Scheduled for construction in 2028-2029
Construction will occur at the I-90 and Hwy 52 interchange, southeast of Rochester.
- Scheduled for construction in 2024-2025
Resurface Hwy 218 north of Austin from I-90 to Mower Co. Rd. 36 south of Blooming Prairie.
- Scheduled for construction in 2027
The Hwy 218 corridor through Blooming Prairie (Fourth Street to Hwy 30) is due for reconstruction in 2025.
- Scheduled for construction in 2027
Hwy 246 from Rice Co. Rd. 26 in Nerstrand to Hwy 56 will extend the life of the road and provide a smoother ride. Resurface, update guardrail, and repair or replace over 20 culverts
- Scheduled for construction in 2025
Reconstructing Hwy 250 from the Hwy 250 bridge over the Root River to Hwy 16.
- Scheduled for construction in 2027
Replace five traffic signals in Albert Lea and Faribault.
- Scheduled for construction in 2024-2025