To ensure safe, efficient, and reliable travel for motorists that use the more than 1,700 miles of roads and 225 bridges under the jurisdiction of Macomb County, MDCR is committed to improving our transportation infrastructure by delivering quality road, bridge, and traffic projects.
Between state, county, and local projects, there are hundreds of work zones in Macomb County each year. To help all road users navigate construction work in Macomb County, the Macomb Work Zone includes information and resources to keep the public informed and up to date of what's happening on the roadways.
Sign up to receive real-time lane closure information and construction updates from the Department of Roads.
Active projects
Below is a list of active Macomb County projects.
Dequindre Road at the Shelby Township border
Location: The Great Lakes Water Authority (GLWA) is continuing to work on the second phase of infrastructure improvements in the area of Dequindre Road between Hamlin Road and Avon Road and Dequindre Road between 23 Mile Road and 24 Mile Road. Dequindre Road between Hamlin Road and Avon Road is anticipated to reopen October 25 and Dequindre Road between 23 Mile Road and 24 Mile Road is anticipated to close starting October 28 through Fall of 2025. The Clinton River Trail and Macomb Orchard Trail between Letica Drive and 24 Mile Road will be closed.
Traffic: Drivers are encouraged to follow the posted detours and seek alternate routes when possible.
Duration: November 1, 2023 – December 31, 2025
Description: Installation of new 96-inch water transmission main. Work is part of the Great Lakes Water Authority (GLWA) project. Contact 1-877-237-7311 or 96inchwatermain@glwater.org for additional information.
🚧 Garfield Road in Fraser 🚧
Location: Between 14 Mile Road and 15 Mile Road
Traffic: Northbound traffic will be maintained on the northbound lanes of Garfield Road. Southbound traffic on Garfield Road will be detoured. The eastbound right turn lane and westbound left turn lane of 15 Mile Road will be closed at Garfield Road. The westbound left turn lane from Klein Road to Garfield Road will be closed. Drivers are encouraged to follow the posted detours and seek alternate routes when possible.
Duration: July 22, 2024 – August 2025
Description: Road reconstruction.
South River Road bridge in Harrison Township
Location: Over the channel to Lake St. Clair east of Lakeshore Drive
Traffic: South River Road will remain open to traffic. A temporary bridge structure will be in place.
Duration: March 3, 2025 – August 2025
Description: Bridge replacement.
10 Mile Road in Warren and Center Line
Location: Between Ryan Road and Lorraine Avenue
Traffic: One lane of traffic will be maintained in each direction. Turning movements from 10 Mile Road onto intersecting roads will be restricted at times with flagging operations in place. Drivers are encouraged to follow the posted detours and seek alternate routes.
Duration: March 18, 2025 – November 2025
Description: Road rehabilitation between Ryan Road and Sherwood Avenue. Road reconstruction between Sherwood Avenue and Lorraine Avenue.
18 Mile Road Bridge in Sterling Heights
Location: Over the Plumbrook Drain
Traffic: 18 Mile Road will be closed to through traffic between Van Dyke Avenue and Mound Road. Drivers are encouraged to follow the posted detour and seek alternate routes.
Duration: April 1, 2025 – June 2025
Description: Bridge rehabilitation.
Copperwood Commons in Washington Township
Location: Subdivision Road
Traffic: The road will remain open and traffic will be maintained at all times to allow residents to enter and exit the subdivision.
Duration: May 19, 2025 – June 2025
Description: Road resurfacing. The project is part of MCDR's 2025 Subdivision Preservation Program.
Dartmoor Drive in Shelby Township
Location: Subdivision Road
Traffic: The road will remain open and traffic will be maintained at all times to allow residents to enter and exit the subdivision.
Duration: May 19, 2025 – June 2025
Description: Road reconstruction. The project is part of MCDR's 2025 Subdivision Reconstruction Program.
Kingsway Drive in Shelby Township
Location: Subdivision Road
Traffic: The road will remain open and traffic will be maintained at all times to allow residents to enter and exit the subdivision.
Duration: May 19, 2025 – June 2025
Description: Road reconstruction. The project is part of MCDR's 2025 Subdivision Reconstruction Program.
Vanker Avenue Street in Shelby Township
Location: Subdivision Road
Traffic: The road will remain open and traffic will be maintained at all times to allow residents to enter and exit the subdivision.
Duration: May 19, 2025 – June 2025
Description: Road reconstruction. The project is part of MCDR's 2025 Subdivision Reconstruction Program.
McKishnie Street in Clinton Township
Location: Subdivision Road
Traffic: The road will remain open and traffic will be maintained at all times to allow residents to enter and exit the subdivision.
Duration: May 19, 2025 – June 2025
Description: Road reconstruction. The project is part of MCDR's 2025 Subdivision Reconstruction Program.
18 Mile Road in Sterling Heights
Location: Between Mound Road and Utica Road
Traffic: The project will be completed in four stages. One-way traffic will be maintained during all four phases of construction operations. Drivers are encouraged to follow the posted detours and seek alternate routes.
Duration: June 9, 2025 – October 2025
Description: Road rehabilitation.
24 Mile Road in Chesterfield Township
Location: Between Baker Road and Foster Road
Traffic: The road will remain open to traffic with intermittent flagging operations in place during construction operations for approximately 30 days. Drivers should expect delays and are encouraged to seek alternate routes.
Duration: June 10, 2025 – July 2025
Description: Asphalt preservation and resurfacing. The project is part of MCDR's 2025 Pavement Preservation Program (PPP).
Sass Road in Chesterfield Township
Location: Between 23 Mile Road and 24 Mile Road
Traffic: The road will remain open to traffic with intermittent flagging operations in place during construction operations for approximately 30 days. Drivers should expect delays and are encouraged to seek alternate routes.
Duration: June 10, 2025 – July 2025
Description: Asphalt preservation and resurfacing. The project is part of MCDR's 2025 Pavement Preservation Program (PPP).
🚧 Card Road in Macomb Township 🚧
Location: Between 21 Mile Road and 23 Mile Road
Traffic: Starting June 30, pavement milling operations are anticipated to take place for approximately two days. The road will be restricted to one-way traffic. Drivers should expect delays and are encouraged to seek alternate routes.
Duration: June 10, 2025 – July 2025
Description: Asphalt preservation and resurfacing. The project is part of MCDR's 2025 Pavement Preservation Program (PPP).
🚧 Guardrail Safety Work in Macomb County 🚧
Location: Countywide
Traffic: A contractor will perform guardrail work at 23 locations throughout Macomb County. Intermittent lane closures will be in place at active project locations. The schedule for each location may vary and weather may affect scheduled work.
Duration: June 23, 2025 – August 2025
Description: Guardrail work. Work is part of MCDR's 2025 Guardrail Safety Program.
🚧 Independence Avenue in Shelby Township 🚧
Location: Subdivision Road
Traffic: The road will remain open and traffic will be maintained at all times to allow residents to enter and exit the subdivision.
Duration: June 30, 2025 – July 2025
Description: Road resurfacing. The project is part of MCDR's 2025 Subdivision Preservation Program.
🚧 Rhode Drive in Shelby Township 🚧
Location: Subdivision Road
Traffic: The road will remain open and traffic will be maintained at all times to allow residents to enter and exit the subdivision.
Duration: June 30, 2025 – July 2025
Description: Road resurfacing. The project is part of MCDR's 2025 Subdivision Preservation Program.
🚧 Vineyard Avenue in Shelby Township 🚧
Location: Subdivision Road
Traffic: The road will remain open and traffic will be maintained at all times to allow residents to enter and exit the subdivision.
Duration: June 30, 2025 – July 2025
Description: Road resurfacing. The project is part of MCDR's 2025 Subdivision Preservation Program.
🚧 Millstone Drive in Macomb Township 🚧
Location: Fox Elementary School to Romeo Plank Road
Traffic: The road will remain open but will be reduced to one-way traffic. Drivers should expect delays and are encouraged to seek alternate routes.
Duration: July 7, 2025 – August 2025
Description: Full depth concrete pavement repair. The project is part of MCDR's 2025 Pavement Preservation Program (PPP).
🚧 – Indicates new project or updated project information.
All dates are estimated and subject to change. Weather affects all work and may cause delays or cancellations.
2025 planned projects
MCDR has an extensive mix of work and road, bridge and traffic infrastructure improvements planned for 2025. Below is a list of anticipated projects.
Roads |
||||
Project | Location | Estimated Cost | Type of Work | Community |
10 Mile Road | Sherwood Avenue to Lorraine Avenue | $10,000,000 | Reconstruction | Center Line |
10 Mile Road | Ryan Road to Sherwood Avenue | $5,662,873 | Rehabilitation | Warren |
14 Mile Road | Van Dyke Avenue (M-53) to Hoover Road | $3,789,807 | Rehabilitation | Sterling Heights and Warren |
14 Mile Road | Kelly Road to Gratiot Avenue (M-3) | $3,836,057 | Rehabilitation | Clinton Township and Roseville |
18 Mile Road | Mound Road to Utica Road | $2,800,000 | Rehabilitation | Sterling Heights |
Garfield Road | 14 Mile Road to 15 Mile Road | $8,300,000 | Reconstruction | Fraser |
Powell Road | 30-1/2 Mile Road to 32 Mile Road | $3,503,249 | Reconstruction | Washington Township |
Romeo Plank Road | 30 Mile Road to 31 Mile Road | $758,215 | Preventive Maintenance | Ray Township |
Utica Road | Hayes Road to Metropolitan Parkway | $975,759 | Rehabilitation | Clinton Township |
Pavement Preservation |
||||
Project | Location | Estimated Cost | Type of Work | Community |
24 Mile Road | Foster Road to Baker Road | $732,765 | Asphalt preservation and resurfacing | Chesterfield Township |
25 Mile Road | Broughton Road to Foss Road | $299,520 | Asphalt preservation and resurfacing | Macomb Township |
Armada Ridge Road | West of Russ Road to west of Cryderman Road | $449,725 | Asphalt preservation and resurfacing | Richmond Township |
Auburn Road | Ryan Road to Jamestown Road | $654,395 | Asphalt preservation and resurfacing | Shelby Township |
Card Road | 21 Mile Road to 23 Mile Road | $736,767 | Asphalt preservation and resurfacing | Macomb Township |
Egan Street | Carlier Street to Little Mack Avenue | $154,175 | Asphalt preservation and resurfacing | Clinton Township |
Elizabeth Road | North of Brywood Court to Groesbeck Highway (M-97) | $354,550 | Asphalt preservation and resurfacing | Clinton Township |
Haven Ridge Road | Rambling Lane to 31 Mile Road | $430,850 | Asphalt preservation and resurfacing | Lenox Township |
Kerry Street | Groesbeck Highway (M-97) to Egan Street | $72,085 | Asphalt preservation and resurfacing | Clinton Township |
McKay Road | 33 Mile Road to 34 Mile Road | $437,875 | Asphalt preservation and resurfacing | Bruce Township |
Sass Road | 23 Mile Road to 24 Mile Road | $431,575 | Asphalt preservation and resurfacing | Chesterfield Township |
Millstone Drive | Fox Elementary School to Romeo Plank Road | $633,700 | Concrete pavement repair | Macomb Township |
Riverwoods Drive | Hall Road (M-59) to Winthrop Place | $647,805 | Concrete pavement repair | Macomb Township |
Hillsboro Drive | Heydenreich Road to Windemere Drive | $607,950 | Concrete pavement repair | Macomb Township |
Terra Bella Street | Huron Elementary School to Garfield Road | $858,210 | Concrete pavement repair | Clinton Township |
Copperwood Drive | Entrance | $94,070 | Concrete pavement repair | Washington Township |
Van Dyke Avenue Ramp | Van Dyke Avenue to A Avenue | $546,735 | Concrete pavement repair | Washington Township |
Metropolitan Parkway and Crocker Boulevard | Intersection | $169,732 | Concrete pavement repair | Harrison Township |
Metropolitan Parkway and Jefferson Avenue | Intersection | $135,505 | Concrete pavement repair | Harrison Township |
Chesterfield Road | 52000 Chesterfield Road to 24 Mile Road | $295,975 | Concrete pavement repair | Chesterfield Township |
Schoenherr Road | At Harold Street | $27,190 | Concrete pavement repair | Warren |
Kingscross Drive | Dequindre Road to Scarboro Way | $202,400 | Concrete pavement repair | Shelby Township |
26 Mile Road and Scotland Boulevard | Deceleration lane | $107,850 | Concrete pavement repair | Shelby Township |
26 Mile Road and Aberdeen Drive | Deceleration lane | $97,750 | Concrete pavement repair | Shelby Township |
Kelly Court | Cul-de-sac | $73,695 | Concrete pavement repair | Shelby Township |
Quinn Road | Gratiot Avenue (M-3) to Harper Avenue | $18,000 | Crack seal | Clinton Township |
Harrington Street | Moravian Drive to Groesbeck Highway (M-97) | $6,000 | Crack seal | Clinton Township |
Greenfield Road | Canal Road to Romeo Plank Road | $10,000 | Crack seal | Clinton Township |
Garfield Road | 17 Mile Road to 19 Mile Road | $42,000 | Crack seal | Clinton Township |
Armada Ridge Road | Hicks Road to the Village of Armada limits | $14,000 | Crack seal | Armada Township |
Sugarbush Road | 21 Mile Road to Cotton Road | $8,000 | Crack seal | Chesterfield Township |
Sugarbush Road | North of Rachid Lane to north of Sugar Creek Drive | $8,000 | Crack seal | Chesterfield Township |
Callens Road | Sass Road to Kiely Drive | $8,000 | Crack seal | Chesterfield Township |
Haven Ridge Road | New Haven Village limits to Rambling Lane | $20,000 | Crack seal | Lenox Township |
Haven Ridge Road | 31 Mile Road to 32 Mile Road | $8,000 | Crack seal | Lenox Township |
Hayes Road | 18 Mile Road to Hall Road (M-59) | $42,000 | Crack seal | Clinton Township and Sterling Heights |
22 Mile Road | Ryan Road to Hayes Road | $48,000 | Crack seal | Shelby Township |
21 Mile Road | Shelby Road to Garfield Road | $48,000 | Crack seal | Shelby Township and Macomb Township |
26 Mile Road | 20200 26 Mile Road to 1500' east of Broughton Road | $4,800 | Crack seal | Macomb Township and Ray Township |
27 Mile Road | Romeo Plank Road to 2300' east of Kunstman Road | $12,000 | Crack seal | Ray Township |
32 Mile Road | Powell Road to 1300' west of Romeo Plank Road | $6,000 | Crack seal | Armada Township and Ray Township |
32 Mile Road | Wolcott Road to 300' east of Hicks Road | $6,000 | Crack seal | Armada Township and Ray Township |
Armada Center Road | Capac Road to Omo Road | $34,000 | Crack seal | Armada Township and Village of Armada |
McVicar Road | East Gates Street to 33 Mile Road | $6,000 | Crack seal | Bruce Township |
Wolcott Road | 29 Mile Road to Indian Trail | $5,200 | Crack seal | Ray Township |
Utica Road | Van Dyke Avenue to Hayes Road | $40,000 | Crack seal | Sterling Heights |
25 Mile Road | Hayes Road to Romeo Plank Road east of roundabout | $13,000 | Crack seal | Macomb Township |
Bridges |
||||
Project | Location | Estimated Cost | Type of Work | Community |
14 Mile Road | Over the Red Run Drain | $477,000 | Bridge Preventive Maintenance | Sterling Heights and Warren |
18 Mile Road | Over the Plumbrook Drain | $1,177,247 | Bridge Deck Replacement | Sterling Heights |
32 Mile Road | Over Highbank Creek | $1,935,000 | Bridge Superstructure Replacement | Lenox Township and Richmond Township |
34 Mile Road | Over Highbank Creek | $1,398,035 | Bridge Replacement | Richmond Township |
Hayes Road | Over the Clinton River | $1,393,000 | Bridge Rehabilitation | Clinton Township and Sterling Heights |
Raap Road | Over the Fisher Lake Outlet | $689,313 | Bridge Replacement | Bruce Township |
South River Road | Over the channel to Lake St. Clair | $2,257,000 | Bridge Replacement | Harrison Township |
Utica Road | Over the Red Run Drain | $1,909,000 | Bridge Rehabilitation | Clinton Township |
Subdivision Roads |
||||
Project | Location | Estimated Cost | Type of Work | Community |
McKishnie Street | Subdivision Road | $727,914 | Reconstruction | Clinton Township |
Vanker Avenue | Subdivision Road | $1,004,011 | Reconstruction | Shelby Township |
Dartmoor Drive | Subdivision Road | $835,105 | Reconstruction | Shelby Township |
Kingsway Drive | Subdivision Road | $894,754 | Reconstruction | Shelby Township |
Copperwood Commons | Subdivision Road | $869,253 | Preventive Maintenance | Washington Township |
Telstar Street | Subdivision Road | $184,307 | Preventive Maintenance | Chesterfield Township |
Hooker Road | Subdivision Road | $62,339 | Preventive Maintenance | Chesterfield Township |
Sugarbush Road | Subdivision Road | $83,571 | Preventive Maintenance | Chesterfield Township |
Fierz Street | Subdivision Road | $92,154 | Preventive Maintenance | Clinton Township |
Hilldale Street | Subdivision Road | $228,125 | Preventive Maintenance | Clinton Township |
Ingleside Street | Subdivision Road | $226,093 | Preventive Maintenance | Clinton Township |
Rhode Drive | Subdivision Road | $205,539 | Preventive Maintenance | Shelby Township |
Vineyard Avenue | Subdivision Road | $110,675 | Preventive Maintenance | Shelby Township |
Independence Avenue | Subdivision Road | $136,649 | Preventive Maintenance | Shelby Township |
Traffic |
||||
Project | Location | Estimated Cost | Type of Work | Community |
Traffic Operations Center | Countywide | $4,015,000 | Operation and Maintenance of the Macomb County Department of Roads Traffic Operations Center | Countywide |
Fiber Optic Phase 4 | Multiple Locations | $2,373,076 | Fiber Optic Cable Installation | Warren, Eastpointe, Roseville, Clinton Township, and Utica |
Fiber Optic Phase 5 | Multiple Locations | $2,287,104 | Fiber Optic Cable Installation | Utica, Shelby Township, Macomb Township, and Chesterfield Township |
Signal Modernization | Multiple Locations | $1,594,428 | Upgrade to Box Span | Fraser, Saint Clair Shores, Shelby Township, Macomb Township, and Chesterfield Township |
Signal Modernization | Multiple Locations | $2,023,857 | Upgrade to Box Span | Various Locations |
Signal Modernization | Multiple Locations | $6,209,753 | Upgrade to Box Span | Various Locations |
Longitudinal Pavement Marking | Multiple Locations | $1,794,100 | Pavement Line Painting | Countywide |
Special Pavement Marking | Multiple Locations | $597,740 | Upgrade Stop Bars and Crosswalks | Countywide |
Guardrail Safety | Multiple Locations | $205,419 | Guardrail Upgrades | Shelby Township, Macomb Township, Chesterfield Township, Bruce Township, Armada Township, and Richmond Township |
Non-Motorized Pathways |
||||
Project | Location | Estimated Cost | Type of Work | Community |
26 Mile Road Pedestrian Bridge | Non-Motorized Pathway | $1,334,168 | Pedestrian Bridge Construction | Washington Township |
Jefferson Avenue Pathway | Non-Motorized Pathway | $660,810 | Pathway Construction | Chesterfield Township |
Jefferson Avenue Spillway Pedestrian Bridge | Non-Motorized Pathway | $2,793,154 | Pedestrian Bridge Construction | Harrison Township |
Clinton River Spillway Trail | Non-Motorized Pathway | $728,635 | Pathway Improvements | Clinton Township |
Schoenherr Road Pedestrian Bridge | Non-Motorized Pathway | $600,000 | Pedestrian Bridge Construction | Sterling Heights |
Bonior Trail | Non-Motorized Pathway | $2,032,115 | Pathway Improvements | Clinton Township |
Anticipated projects are subject to change.