Macomb County’s home for road and bridge construction and traffic project information. To help all road users navigate construction work in Macomb County, the Macomb Work Zone includes information and resources to keep the public informed and up to date of what's happening on the roadways.

Construction barrel and arrow board in a work zone.

To ensure safe, efficient, and reliable travel for motorists that use the more than 1,700 miles of roads and 225 bridges under the jurisdiction of Macomb County, MDCR is committed to improving our transportation infrastructure by delivering quality road, bridge, and traffic projects.

Between state, county, and local projects, there are hundreds of work zones in Macomb County each year. To help all road users navigate construction work in Macomb County, the Macomb Work Zone includes information and resources to keep the public informed and up to date of what's happening on the roadways.

Sign up to receive real-time lane closure information and construction updates from the Department of Roads.

Active projects

Below is a list of active Macomb County projects.

Dequindre Road at the Shelby Township border
Location: The Great Lakes Water Authority (GLWA) is continuing to work on the second phase of infrastructure improvements in the area of Dequindre Road between Hamlin Road and Avon Road and Dequindre Road between 23 Mile Road and 24 Mile Road. Dequindre Road between Hamlin Road and Avon Road is anticipated to reopen October 25 and Dequindre Road between 23 Mile Road and 24 Mile Road is anticipated to close starting October 28 through Fall of 2025. The Clinton River Trail and Macomb Orchard Trail between Letica Drive and 24 Mile Road will be closed.
Traffic: Drivers are encouraged to follow the posted detours and seek alternate routes when possible.
Duration: November 1, 2023 – December 31, 2025
Description: Installation of new 96-inch water transmission main. Work is part of the Great Lakes Water Authority (GLWA) project. Contact 1-877-237-7311 or 96inchwatermain@glwater.org for additional information.

🚧 Garfield Road in Fraser 🚧
Location: Between 14 Mile Road and 15 Mile Road
Traffic: Northbound traffic will be maintained on the northbound lanes of Garfield Road. Southbound traffic on Garfield Road will be detoured. The eastbound right turn lane and westbound left turn lane of 15 Mile Road will be closed at Garfield Road. The westbound left turn lane from Klein Road to Garfield Road will be closed. Drivers are encouraged to follow the posted detours and seek alternate routes when possible.
Duration: July 22, 2024 – August 2025
Description: Road reconstruction.

South River Road bridge in Harrison Township
Location: Over the channel to Lake St. Clair east of Lakeshore Drive
Traffic: South River Road will remain open to traffic. A temporary bridge structure will be in place.
Duration: March 3, 2025 – August 2025
Description: Bridge replacement.

10 Mile Road in Warren and Center Line
Location: Between Ryan Road and Lorraine Avenue
Traffic: One lane of traffic will be maintained in each direction. Turning movements from 10 Mile Road onto intersecting roads will be restricted at times with flagging operations in place. Drivers are encouraged to follow the posted detours and seek alternate routes.
Duration: March 18, 2025 – November 2025
Description: Road rehabilitation between Ryan Road and Sherwood Avenue. Road reconstruction between Sherwood Avenue and Lorraine Avenue.

18 Mile Road Bridge in Sterling Heights
Location: Over the Plumbrook Drain
Traffic: 18 Mile Road will be closed to through traffic between Van Dyke Avenue and Mound Road. Drivers are encouraged to follow the posted detour and seek alternate routes.
Duration: April 1, 2025 – June 2025
Description: Bridge rehabilitation.

Copperwood Commons in Washington Township
Location: Subdivision Road
Traffic: The road will remain open and traffic will be maintained at all times to allow residents to enter and exit the subdivision.
Duration: May 19, 2025 – June 2025
Description: Road resurfacing. The project is part of MCDR's 2025 Subdivision Preservation Program.

Dartmoor Drive in Shelby Township
Location: Subdivision Road
Traffic: The road will remain open and traffic will be maintained at all times to allow residents to enter and exit the subdivision.
Duration: May 19, 2025 – June 2025
Description: Road reconstruction. The project is part of MCDR's 2025 Subdivision Reconstruction Program.

Kingsway Drive in Shelby Township
Location: Subdivision Road
Traffic: The road will remain open and traffic will be maintained at all times to allow residents to enter and exit the subdivision.
Duration: May 19, 2025 – June 2025
Description: Road reconstruction. The project is part of MCDR's 2025 Subdivision Reconstruction Program.

Vanker Avenue Street in Shelby Township
Location: Subdivision Road
Traffic: The road will remain open and traffic will be maintained at all times to allow residents to enter and exit the subdivision.
Duration: May 19, 2025 – June 2025
Description: Road reconstruction. The project is part of MCDR's 2025 Subdivision Reconstruction Program.

McKishnie Street in Clinton Township
Location: Subdivision Road
Traffic: The road will remain open and traffic will be maintained at all times to allow residents to enter and exit the subdivision.
Duration: May 19, 2025 – June 2025
Description: Road reconstruction. The project is part of MCDR's 2025 Subdivision Reconstruction Program.

18 Mile Road in Sterling Heights
Location: Between Mound Road and Utica Road
Traffic: The project will be completed in four stages. One-way traffic will be maintained during all four phases of construction operations. Drivers are encouraged to follow the posted detours and seek alternate routes.
Duration: June 9, 2025 – October 2025
Description: Road rehabilitation.

24 Mile Road in Chesterfield Township
Location: Between Baker Road and Foster Road
Traffic: The road will remain open to traffic with intermittent flagging operations in place during construction operations for approximately 30 days. Drivers should expect delays and are encouraged to seek alternate routes.
Duration: June 10, 2025 – July 2025
Description: Asphalt preservation and resurfacing. The project is part of MCDR's 2025 Pavement Preservation Program (PPP).

Sass Road in Chesterfield Township
Location: Between 23 Mile Road and 24 Mile Road
Traffic: The road will remain open to traffic with intermittent flagging operations in place during construction operations for approximately 30 days. Drivers should expect delays and are encouraged to seek alternate routes.
Duration: June 10, 2025 – July 2025
Description: Asphalt preservation and resurfacing. The project is part of MCDR's 2025 Pavement Preservation Program (PPP).

🚧 Card Road in Macomb Township 🚧
Location: Between 21 Mile Road and 23 Mile Road
Traffic: Starting June 30, pavement milling operations are anticipated to take place for approximately two days. The road will be restricted to one-way traffic. Drivers should expect delays and are encouraged to seek alternate routes.
Duration: June 10, 2025 – July 2025
Description: Asphalt preservation and resurfacing. The project is part of MCDR's 2025 Pavement Preservation Program (PPP).

🚧 Guardrail Safety Work in Macomb County 🚧
Location: Countywide
Traffic: A contractor will perform guardrail work at 23 locations throughout Macomb County. Intermittent lane closures will be in place at active project locations. The schedule for each location may vary and weather may affect scheduled work.
Duration: June 23, 2025 – August 2025
Description: Guardrail work. Work is part of MCDR's 2025 Guardrail Safety Program.

🚧 Independence Avenue in Shelby Township 🚧
Location: Subdivision Road
Traffic: The road will remain open and traffic will be maintained at all times to allow residents to enter and exit the subdivision.
Duration: June 30, 2025 – July 2025
Description: Road resurfacing. The project is part of MCDR's 2025 Subdivision Preservation Program.

🚧 Rhode Drive in Shelby Township 🚧
Location: Subdivision Road
Traffic: The road will remain open and traffic will be maintained at all times to allow residents to enter and exit the subdivision.
Duration: June 30, 2025 – July 2025
Description: Road resurfacing. The project is part of MCDR's 2025 Subdivision Preservation Program.

🚧 Vineyard Avenue in Shelby Township 🚧
Location: Subdivision Road
Traffic: The road will remain open and traffic will be maintained at all times to allow residents to enter and exit the subdivision.
Duration: June 30, 2025 – July 2025
Description: Road resurfacing. The project is part of MCDR's 2025 Subdivision Preservation Program.

🚧 Millstone Drive in Macomb Township 🚧
Location: Fox Elementary School to Romeo Plank Road
Traffic: The road will remain open but will be reduced to one-way traffic. Drivers should expect delays and are encouraged to seek alternate routes.
Duration: July 7, 2025 – August 2025
Description: Full depth concrete pavement repair. The project is part of MCDR's 2025 Pavement Preservation Program (PPP).

🚧  Indicates new project or updated project information.

All dates are estimated and subject to change. Weather affects all work and may cause delays or cancellations.

2025 planned projects

MCDR has an extensive mix of work and road, bridge and traffic infrastructure improvements planned for 2025. Below is a list of anticipated projects.

Roads

Project Location Estimated Cost Type of Work Community
10 Mile Road Sherwood Avenue to Lorraine Avenue $10,000,000 Reconstruction Center Line
10 Mile Road Ryan Road to Sherwood Avenue $5,662,873 Rehabilitation Warren
14 Mile Road Van Dyke Avenue (M-53) to Hoover Road $3,789,807 Rehabilitation Sterling Heights and Warren
14 Mile Road Kelly Road to Gratiot Avenue (M-3) $3,836,057 Rehabilitation Clinton Township and Roseville
18 Mile Road Mound Road to Utica Road $2,800,000 Rehabilitation Sterling Heights
Garfield Road 14 Mile Road to 15 Mile Road $8,300,000 Reconstruction Fraser
Powell Road 30-1/2 Mile Road to 32 Mile Road $3,503,249 Reconstruction Washington Township
Romeo Plank Road 30 Mile Road to 31 Mile Road $758,215 Preventive Maintenance Ray Township
Utica Road Hayes Road to Metropolitan Parkway $975,759 Rehabilitation Clinton Township

Pavement Preservation

Project Location Estimated Cost Type of Work Community
24 Mile Road Foster Road to Baker Road $732,765 Asphalt preservation and resurfacing Chesterfield Township
25 Mile Road Broughton Road to Foss Road $299,520 Asphalt preservation and resurfacing Macomb Township
Armada Ridge Road West of Russ Road to west of Cryderman Road $449,725 Asphalt preservation and resurfacing Richmond Township
Auburn Road Ryan Road to Jamestown Road $654,395 Asphalt preservation and resurfacing Shelby Township
Card Road 21 Mile Road to 23 Mile Road $736,767 Asphalt preservation and resurfacing Macomb Township
Egan Street Carlier Street to Little Mack Avenue $154,175 Asphalt preservation and resurfacing Clinton Township
Elizabeth Road North of Brywood Court to Groesbeck Highway (M-97) $354,550 Asphalt preservation and resurfacing Clinton Township
Haven Ridge Road Rambling Lane to 31 Mile Road $430,850 Asphalt preservation and resurfacing Lenox Township
Kerry Street Groesbeck Highway (M-97) to Egan Street $72,085 Asphalt preservation and resurfacing Clinton Township
McKay Road 33 Mile Road to 34 Mile Road $437,875 Asphalt preservation and resurfacing Bruce Township
Sass Road 23 Mile Road to 24 Mile Road $431,575 Asphalt preservation and resurfacing Chesterfield Township
Millstone Drive Fox Elementary School to Romeo Plank Road $633,700 Concrete pavement repair Macomb Township
Riverwoods Drive Hall Road (M-59) to Winthrop Place $647,805 Concrete pavement repair Macomb Township
Hillsboro Drive Heydenreich Road to Windemere Drive $607,950 Concrete pavement repair Macomb Township
Terra Bella Street Huron Elementary School to Garfield Road $858,210 Concrete pavement repair Clinton Township
Copperwood Drive Entrance $94,070 Concrete pavement repair Washington Township
Van Dyke Avenue Ramp Van Dyke Avenue to A Avenue $546,735 Concrete pavement repair Washington Township
Metropolitan Parkway and Crocker Boulevard Intersection $169,732 Concrete pavement repair Harrison Township
Metropolitan Parkway and Jefferson Avenue Intersection $135,505 Concrete pavement repair Harrison Township
Chesterfield Road 52000 Chesterfield Road to 24 Mile Road $295,975 Concrete pavement repair Chesterfield Township
Schoenherr Road At Harold Street $27,190 Concrete pavement repair Warren
Kingscross Drive Dequindre Road to Scarboro Way $202,400 Concrete pavement repair Shelby Township
26 Mile Road and Scotland Boulevard Deceleration lane $107,850 Concrete pavement repair Shelby Township
26 Mile Road and Aberdeen Drive Deceleration lane $97,750 Concrete pavement repair Shelby Township
Kelly Court Cul-de-sac $73,695 Concrete pavement repair Shelby Township
Quinn Road Gratiot Avenue (M-3) to Harper Avenue $18,000 Crack seal Clinton Township
Harrington Street Moravian Drive to Groesbeck Highway (M-97) $6,000 Crack seal Clinton Township
Greenfield Road Canal Road to Romeo Plank Road $10,000 Crack seal Clinton Township
Garfield Road 17 Mile Road to 19 Mile Road $42,000 Crack seal Clinton Township
Armada Ridge Road Hicks Road to the Village of Armada limits $14,000 Crack seal Armada Township
Sugarbush Road 21 Mile Road to Cotton Road $8,000 Crack seal Chesterfield Township
Sugarbush Road North of Rachid Lane to north of Sugar Creek Drive $8,000 Crack seal Chesterfield Township
Callens Road Sass Road to Kiely Drive $8,000 Crack seal Chesterfield Township
Haven Ridge Road New Haven Village limits to Rambling Lane $20,000 Crack seal Lenox Township
Haven Ridge Road 31 Mile Road to 32 Mile Road $8,000 Crack seal Lenox Township
Hayes Road 18 Mile Road to Hall Road (M-59) $42,000 Crack seal Clinton Township and Sterling Heights
22 Mile Road Ryan Road to Hayes Road $48,000 Crack seal Shelby Township
21 Mile Road Shelby Road to Garfield Road $48,000 Crack seal Shelby Township and Macomb Township
26 Mile Road 20200 26 Mile Road to 1500' east of Broughton Road $4,800 Crack seal Macomb Township and Ray Township
27 Mile Road Romeo Plank Road to 2300' east of Kunstman Road $12,000 Crack seal Ray Township
32 Mile Road Powell Road to 1300' west of Romeo Plank Road $6,000 Crack seal Armada Township and Ray Township
32 Mile Road Wolcott Road to 300' east of Hicks Road $6,000 Crack seal Armada Township and Ray Township
Armada Center Road Capac Road to Omo Road $34,000 Crack seal Armada Township and Village of Armada
McVicar Road East Gates Street to 33 Mile Road $6,000 Crack seal Bruce Township
Wolcott Road 29 Mile Road to Indian Trail $5,200 Crack seal Ray Township
Utica Road Van Dyke Avenue to Hayes Road $40,000 Crack seal Sterling Heights
25 Mile Road Hayes Road to Romeo Plank Road east of roundabout $13,000 Crack seal Macomb Township

Bridges

Project Location Estimated Cost Type of Work Community
14 Mile Road Over the Red Run Drain $477,000 Bridge Preventive Maintenance Sterling Heights and Warren
18 Mile Road Over the Plumbrook Drain $1,177,247 Bridge Deck Replacement Sterling Heights
32 Mile Road Over Highbank Creek $1,935,000 Bridge Superstructure Replacement Lenox Township and Richmond Township
34 Mile Road Over Highbank Creek $1,398,035 Bridge Replacement Richmond Township
Hayes Road Over the Clinton River  $1,393,000 Bridge Rehabilitation Clinton Township and Sterling Heights
Raap Road Over the Fisher Lake Outlet $689,313 Bridge Replacement Bruce Township
South River Road Over the channel to Lake St. Clair $2,257,000 Bridge Replacement Harrison Township
Utica Road Over the Red Run Drain $1,909,000 Bridge Rehabilitation Clinton Township

Subdivision Roads

Project Location Estimated Cost Type of Work Community
McKishnie Street Subdivision Road $727,914 Reconstruction Clinton Township
Vanker Avenue Subdivision Road $1,004,011 Reconstruction Shelby Township
Dartmoor Drive Subdivision Road $835,105 Reconstruction Shelby Township
Kingsway Drive Subdivision Road $894,754 Reconstruction Shelby Township
Copperwood Commons Subdivision Road $869,253 Preventive Maintenance Washington Township
Telstar Street Subdivision Road $184,307 Preventive Maintenance Chesterfield Township
Hooker Road Subdivision Road $62,339 Preventive Maintenance Chesterfield Township
Sugarbush Road Subdivision Road $83,571 Preventive Maintenance Chesterfield Township
Fierz Street Subdivision Road $92,154 Preventive Maintenance Clinton Township
Hilldale Street Subdivision Road $228,125 Preventive Maintenance Clinton Township
Ingleside Street Subdivision Road $226,093 Preventive Maintenance Clinton Township
Rhode Drive Subdivision Road $205,539 Preventive Maintenance Shelby Township
Vineyard Avenue Subdivision Road $110,675 Preventive Maintenance Shelby Township
Independence Avenue Subdivision Road $136,649 Preventive Maintenance Shelby Township

Traffic

Project Location Estimated Cost Type of Work Community
Traffic Operations Center Countywide $4,015,000 Operation and Maintenance of the Macomb County Department of Roads Traffic Operations Center Countywide
Fiber Optic Phase 4 Multiple Locations $2,373,076 Fiber Optic Cable Installation Warren, Eastpointe, Roseville, Clinton Township, and Utica
Fiber Optic Phase 5 Multiple Locations $2,287,104 Fiber Optic Cable Installation Utica, Shelby Township, Macomb Township, and Chesterfield Township
Signal Modernization Multiple Locations $1,594,428 Upgrade to Box Span Fraser, Saint Clair Shores, Shelby Township, Macomb Township, and Chesterfield Township
Signal Modernization Multiple Locations $2,023,857 Upgrade to Box Span Various Locations
Signal Modernization Multiple Locations $6,209,753 Upgrade to Box Span Various Locations
Longitudinal Pavement Marking Multiple Locations $1,794,100 Pavement Line Painting Countywide
Special Pavement Marking Multiple Locations $597,740 Upgrade Stop Bars and Crosswalks Countywide
Guardrail Safety Multiple Locations $205,419 Guardrail Upgrades Shelby Township, Macomb Township, Chesterfield Township, Bruce Township, Armada Township, and Richmond Township

Non-Motorized Pathways

Project Location Estimated Cost Type of Work Community
26 Mile Road Pedestrian Bridge Non-Motorized Pathway $1,334,168 Pedestrian Bridge Construction Washington Township
Jefferson Avenue Pathway Non-Motorized Pathway $660,810 Pathway Construction Chesterfield Township
Jefferson Avenue Spillway Pedestrian Bridge Non-Motorized Pathway $2,793,154 Pedestrian Bridge Construction Harrison Township
Clinton River Spillway Trail Non-Motorized Pathway $728,635 Pathway Improvements Clinton Township
Schoenherr Road Pedestrian Bridge Non-Motorized Pathway $600,000 Pedestrian Bridge Construction Sterling Heights
Bonior Trail Non-Motorized Pathway $2,032,115 Pathway Improvements Clinton Township

Anticipated projects are subject to change.