U.S. 101 Lincoln City Curb Ramps

Construction Phase

Region 2: Willamette Valley and Northwest Oregon (Lincoln City, Lincoln)


​​​​​​​​​​​​​​​We're upgrading and installing new curb ramps to improve accessibility for all.​​​​​ ​​


Construction banner showing a community of pedestrians and bicyclists with text: Improving Access Whether You: Drive, Ride, Walk or Roll. Underneath the community is a black and yellow caution tape and text: Slow down in the work zone…it could save lives!

Impacts

Traffic Impact

Nighttime shoulder and lane closures, construction noise, debris and delays. Use caution when driving through the area.

Construction Impacts

You can expect:

  • Crews working mostly at night, Monday night through Friday morning from 7 p.m. to 6 a.m.

  • Nighttime single-lane closures as needed.

  • Occasional daytime work as needed.

  • Construction noise and delays.

  • Some sidewalks and crosswalks closed for the safety of both pedestrians and drivers.

  • Nighttime noise while crews finish up.

  • Businesses to remain open.

Interactive Map Icon

See which corners we're looking at by visiting our interactive map. We'll update the map as the project progresses – some location may change. 

Construction Activities

We're doing curb ramp work and paving repairs between​:

  • NW Logan Road and SW 48th Street.
  • North Fogarty Creek State Park and Lance Street/Seagrove Drive.

We're also wrapping up traffic signal work. 

After June, we'll pause for the summer and will return in September after Labor Day. 

Visit TripCheck​ for the most current traffic information.​


​Pedestrians, including those with disabilities, will have access through or around work zones. ​


work zone construction iconPay attention in the work zone, slow down and move over – imagine this is where you work! 

Always drive safely, watch for construction signs and workers. 

Remember: fines double in all Oregon work zones, whether workers and signs are present or not. ​

Details

About

Enlarged project area mapWhether you drive, ride, walk or roll, we are committed to providing the best accessibility possible to all people using the transportation system. 

One of the ways we are doing this is by rebuilding or installing ADA curb ramps in Lincoln City. We're adding textured plates at the curb ramps, called truncated domes. These allow pedestrians to feel, see and hear where the crossing is located and the direction they should go to safely cross the street.

Why are ADA curb ramps important?

ADA curb ramps make it easier for people to move between the sidewalk and road. This can be helpful for those who have trouble stepping up and down high curbs. It's also helpful for people using wheelchairs, strollers​, walkers, hand carts and bicycles. 

By making curb ramps gently slope to the road, it improves accessibility and makes it easier for everyone to get around, whether they have a disability or not.​

Why aren’t all the curb ramps in my community being fixed at the same time?

For this project, we will group and rebuild curb ramps in batches at various locations.

Not all intersections or curb locations are the same. Some are construction-ready and others may have fire hydrants, utility boxes, utility poles, additional land requirements or we need an environmental permit. These are things we consider when scheduling the curb ramp construction in each city.

The construction-ready locations are done first because they can be done immediately while those needing additional coordination or design will be part of a future batch or stage of construction. This is why an intersection with four corners might be completed at different times. Click here to sign up for email updates.

Sign up for email a​lerts to get updates on the project!​

Schedule

Design: 2022 - 2024
​Construction: 2024 - 2026​

Location

U.S. 101 |

​Lincoln City | Milepost 112.3 to 118 and milepost 121.42 to 125.

Cost and Funding

​Design and construction: $23,252,051

Contacts & Media

project area map

Project Contacts

Resident Engineer – Consultant Projects
Julie GaNung
Email
julie.e.ganung@odot.oregon.gov
Phone
541-726-2578

Public Information Officer
Mindy McCartt
Email
mindy.m.mccartt@odot.oregon.gov
Phone
503-507-6045

Get Project Alerts

Sign up for the newsletter!

Last Updated

6/2/2025 5:05 PM

Project Number

22434