Project-Details







OR 223 and OR 99W: ADA Curb Ramps (Rickreall and Dallas)

Construction Phase

Region 2: Willamette Valley and Northwest Oregon (Various Cities, Polk)


​​​​​​​​​​​​​​​​​We're rebuilding curb ramps to meet current ADA accessibility standards in Dallas and Rickreall.​


Banner: Slow down, in the work zone it could save lives. Building a modern transportation system to help Oregon’s communities and economy thrive. During construction, Give yourself more time, try a new way or mode to get there or take a different route.

Impacts

Traffic Impact

Expect shoulder and lane closures as needed along with crews working during the day and at night. The following intersections have night work planned with flaggers helping direct traffic: OR 223 and SW Clay Street and OR 99W and Rickreall Road.

Construction Impacts

You can expect:

  • Crews working during the day and at night.
    • Sunday night through Friday morning from 7 p.m. to 6 a.m.
    • Monday through Friday during the day.
  • Shoulder and lane closures as needed.
  • Flaggers helping direct drivers through the work zone.
  • Temporary traffic shifts as needed.
  • Delays and construction noise.​
  • Businesses to remain open during construction.​
We're working during the day and night at OR 223 and SW Clay Street and at OR 99W and Rickreall Road. We will temporarily turn off the traffic signals during the nighttime work at the OR 99W and Rickreall Road intersection. Flaggers will help direct traffic through both ​intersections. 

The traffic signals at OR 99W and Rickreall Road should be on and working during the day. If a traffic signal is not working and there aren't flaggers helping control traffic, the intersection turns into a four-way stop. We'll install permanent striping once the traffic signal work is complete. 

Construction Activities

We're bringing curb ramps to ADA standards to improve accessibility for everyone. 

We're also working nights at the following intersections:

  • OR 223 and SW Clay Street.
  • OR 99W and Rickreall Road. 

Flaggers will help direct traffic through these intersections.

Visit TripCheck​ for the most current traffic information.​


​Pedestrians, including those with disabilities, will have access through or around work zones. ​


work zone construction iconPay attention in the work zone, slow down and move over – imagine this is where you work! 

Always drive safely, watch for construction signs and workers. 

Remember: fines double in all Oregon work zones, whether workers and signs are present or not.

Details

About

enlarged project map iconWhether you drive, ride, walk or roll, we are committed to providing the best accessibility possible to all people using the transportation system. 

One of the ways we are doing this is by working on over 260 curb ramps in various locations along OR 223 and OR 99W to see what is needed to bring them up to current ADA standards.

This might include:

  • Minor work, such as fixing a ramp that is too steep or moving pedestrian push buttons at crosswalks.
  • Installing crosswalk closed signs if the crossing is considered unsafe.
  • Rebuilding or building a new ramp if needed.
Most corners in the project area only need minor work or signs installed but some corners will require a full rebuild or installation. 

Why are ADA curb ramps important?

ADA curb ramps provide access between the sidewalk and road for people using wheelchairs, strollers, walkers, hand carts, bicycles and also for pedestrians who have trouble stepping up and down high curbs. We're adding textured plates at the curb ramps, called truncated domes. These allow pedestrians to feel, see and hear where the crossing is located and the direction they should go to safely cross the street.

Curb ramps benefit everyone regardless of whether they have a disability. By making curb ramps gently slope to the road, it improves accessibility and promotes safer travel between the sidewalk and road.

Why aren’t all the curb ramps in my community being fixed at the same time?

Once we review each corner, we will group and rebuild curb ramps in batches at various locations.

Not all intersections or curb locations are the same, some are construction-ready and others may have fire hydrants, utility boxes, utility poles, additional land requirements or we need an environmental permit. These are things we consider when scheduling the curb ramp construction in each city.

The construction-ready locations are done first because they can be done immediately while those needing additional coordination or design will be part of a future batch or stage of construction. This is why an intersection with four corners might be completed at different times.

​By making these accessibility improvements, whether you drive, ride, walk or roll, we are committed to providing the best accessibility possible to all people using the transportation system. 

​Schedule

Design: 2022-2024

Construction: 2024-2026

Location

Multiple |

​OR 223 | Milepost 0 - 4.83

OR 99W | Milepost 57.49 - 57.81 

Cost and Funding

Design and construction: $12,132,001


​The funding for this project is combined with the Statewide Transportation Improvement Program project number 23568.


​Transportation funding in Oregon

While the funding crisis is having a profound effect on ODOT’s maintenance and operations, most construction projects will continue as planned. These projects are typically funded through separate capital programs, often with state or federal funds that are legally restricted to project development and cannot be redirected for maintenance or day-to-day operations.

​Delays may still occur due to a reduced workforce. Fewer available staff for traffic control, inspections and project oversight could slow down timelines or introduce challenges in project delivery. 

For more information on ODOT’s funding crisis, visit our website​.​​

Contacts & Media

Project line map

Project Contacts

Project Leader
Wade Luckman
Email
wade.luckman@odot.oregon.gov
Phone
541-419-2085

Public Information Officer
Mindy McCartt
Email
mindy.m.mccartt@odot.oregon.gov
Phone
503-507-6045

Get Project Alerts

Sign up for the newsletter!

Last Updated

7/23/2025 3:37 PM

Project Number

22555